Wednesday, January 5, 2011
Do not neglect the final step in the process of wall tile acceptance of the standard process (Figure).
<p> wall tile paste bricklayer in the home renovation project is mainly engaged in technical work in one. .Paste the wall tiles standard procedures: primary treatment → wiping clean election brick foundation gray → → → row of bricks soaked shells line → point → → paste standard pointing → → rub paste tile joints & rarr .; clean-up. .</ P> <P> <P> <p align="center"> </ p> <p> wall tile paste quality directly affects the effect of the decoration, especially deep. Color sleeve paste tile quality of the .Quality home improvement becomes more prominent, the construction must be in strict accordance with standard procedure, to ensure quality. .</ P> <p> 2, for construction of the wall tile paste </ p> <p> (1) primary treatment, should clean up all kinds of dirt on the wall, and one day before watering moist. .If the wall when the new grass-roots level, to be dry cement mortar Qicheng, they should be behind the brick, bomb line, Tile. .</ P> <p align="center"> </ p> <p> (2) the official must be pasted before pasting the standard points, to control the flatness of the surface of the paste, the operation should always check with the on foot flatness .uneven, not straight, to remove the heavy stick. . ≪/P > <p> (3) before pasting tiles in clear water over two hours in the immersion, subject to the brick is not bubbling, remove the dry stand. .Paste paste from the bottom up, requiring mortar full, loss of gray, you must remove the heavy stick, are not allowed from the cracks between the blocks, the mouth stuffed gray fill pad. .</ P> <p align="center"> </ p> <p> (4) having pipe sticking shop, lights switches, bathroom equipment and other supporting documents, must be consistent with the whole cutting tiles sets, the ban on non- .Paste the entire bricks. .Paste the entire site from time to time should be at once independent, one can not be completed, should remain in the construction joint Jiecha mouth or vaginal corner. .</ P> <p> 3, wall tile wall tile paste paste inspection must be solid, no skew, missing edge off angle and crack and other defects. .</ P> <p align="center"> </ p> <p> wall surface should be flat stick shop, clean, color coordination, design will be reasonable, no discoloration, efflorescence, dirty and damaged at a significant gloss. .Dense brick caulking seams, straight, uniform width, and color, overlapping the corners of yin and yang in the right direction. .Non-integral parts of the appropriate use of brick, arranged in straight. .Reserved the right size hole, edge neatly. .Check the flatness error of less than 2 mm elevation of the vertical error is less than 2 mm, seam height deviation of less than 0.5 mm, flatness of less than 2 mm. . </ P> <p> 4, wall tile paste quality problems and treatment methods </ p> <p> wall tile paste the common quality defects for the hollowing off, change color, seams and surface cracks are not straight. .</ P> <p> (1) the hollowing off: The main reason is the bonding material is not full, not bricks and primary treatment without soaking the net. .Construction, the sleeve must be clean tile clean, soak at least 2 hours, adhesive thickness should be controlled between 7-10 mm, not too thick or too thin. .To paste the bottom tile and dense paste, you can gently tapping with a wooden hammer. .Produce hollowing should remove the wall tiles, chipped original adhesive mortar, add the total volume of 37 gel with cement mortar repair. .</ P> <p> (2) the mere mention: In addition to tile the main reasons of poor quality, too thin axial plane, the operation of improper methods are also important factors. .Construction should be strictly selected materials, immersion sleeve tile clean water should be used. .Cement paste should be used to clean sand and cement. .When you cleanup bricks to the surface of any residual mortar. .Such as the mere mention of a large wall should be updated. .</ P> <p> (3) seams are not straight: The main reason is the difference between brick and construction specifications are improper. .Brick construction should be carefully selected, will return with the same type size used for the wall. .Must be affixed to the standard point, the standard point to be able to rely on the subject on foot, each time after a row with the paste on foot horizontal, vertical by direct inspection, timely correction. .Such as the seams over the allowable error, shall promptly remove the wall tiles, to rework. .</ P> <p> 5, wall tile paste the duration estimates </ p> <p> wall tile paste is a highly technical construction projects, more expensive work, get ready in the supplementary material, the better primary treatment .case, each worker can complete the 5 square meters a day, the general home decoration shop sticky bathroom, kitchen walls need about 7 days time. .Ceramic wall tiles in different sizes, different adhesive used, the number of different primary pipeline wall will affect the construction period. .Therefore, the actual duration should be determined according to the scene. .Paste the construction of the wall tiles, and other projects can work in parallel or cross, but should pay attention to product protection. .</ P>.
Labels:
[:]
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment