Monday, December 27, 2010
Do not wait for work stealing only regret must first complete the ground water (Figure).
<p> playing good lines before paving, the pop-up and the door on the ground level crossing at right angles to the baseline, playing the front line from the beginning to ensure that the entrance for the whole brick, whole brick placed in non-negative angle or furniture, play the line .pop-up control line should be vertical and horizontal positioning. .</ P> <P> <P> <p align="center"> </ p> <p>: The general need bricklayer 1-2. .</ P> <p> order: first, wall stickers, then affixed to the brick. .</ P> <p> time: a good bricklayer is affixed to 5-6 square one, or very difficult to ensure quality. .Especially the small window on the corner of a class needs to place, time-consuming. .</ P> <p align="center"> </ p> <p> 1, Paving color glazed tiles class: </ p> <p> deal with primary shells line → → → paving tiles soaking wet .→ Installation of cement mortar to brick paving block → → → clean → pointing conservation. .</ P> <p> 2, Paving ceramic mosaic tiles (mosaic) class: </ p> <p> deal with primary → bomb line, standard paving cement mortar reinforced → Stones → shoot → Real & rarr .; watering, exposing paper → dial sewing, pouring → clean → conservation. .</ P> <p align="center"> </ p> <p> Laying ceramic floor tiles in the construction points </ p> <p> 1, concrete floor should be primary cutting hair, cutting hair depth of 5 to 10 mm ., chiseling marks are spaced about 30 mm. . After the clean floating dust, mortar, oil, bulk water production brush Major General ground. .</ P> <p> 2, playing a good line before paving, the pop-up and the door on the ground level crossing at right angles to the baseline, playing the front line from the beginning to ensure that the entrance for the whole brick, whole brick placed in non-negative angle .or furniture, play the line should be vertical and horizontal positioning control pop-up line. .</ P> <p> 3, Laying ceramic floor tile before the ceramic floor tile should be first soaked dried </ p> <p> 4, Stones, cement mortar should be full of ceramic tile to put on the back of shop .after the struck with a rubber stick real text. .Also, check with a spirit level correction, wipe the surface of cement mortar. .</ P> <p> 5, Stones End 2 to 3 hours, rub with a white cement joints, with cement, sand = 1:1 (volume) of cement mortar, fill joints to dense, smooth. .Then wipe the surface of cotton yarn. .</ P>.
Labels:
[:]
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment